During this coldest period in the Winter, the Employees in Multifit are confronting with the coldest wind and going to bring the warmest regards to Everyo
After the continuous negotiation in the early stage, Beijing Multifit Electrical Technology Co., Ltd and Guangzhou XiangFa Fishing Gear Manufacturer reach a consensus on December 15th, 2021.
Sign a contract about the construction project of 1.134mwp solar Photovoltaic system for the idle roof space of Guangzhou Xiangfa fishing gear Manufacturer. The estimated construction period for this project is 3 months.
After this construction done, the estimated annual power generation of this project is around 1.7 million kwh. This constructing project can annually generate RMB 1.87 million income. The reduction of annual carbon dioxide emission is 170 tons.
The required equipment for this project has been transported to Guangzhou XiangFa Fishing Gear Manufacturer on December 25, 2021. Next day, this project was officially inaugurated.
In the future, Beijing Multifit Electrical Technology Co., Ltd will continue to uphold the corporate purpose of "enjoying sunshine and benefiting every households." Under strictly control on the product quality, Multifit will continue to invest more funds on Research and Development departments. Moreover, Multifit will unceasingly contribute more efforts to achieve the carbon neutral, green and high efficient energy.
Post time: Dec-31-2021