Installation area:34m²
Solar module:350W*14pcs
Inverter:5000W*1unit
Bracket : 6m C type steel * 9pcs, 41*41*2.5mm
PV Cables (MC4 to Inverter): Black & Red 100M each
MC4 CONNECTOR : 10set
Solar energy is inexhaustible
Grid-connected power generation system. The system is directly integrated into the national grid without batteries,
Free choice of solar panels (monocrystalline/polycrystalline)
Promote spontaneous self-use and build your own sun room
What is your roof area?
What size system do you plan to build?
According to the provided roof area, the largest array of photovoltaic systems can be arranged
Provide the system installation guides after the system arrive
This is the best day of the past month. I have a 3 kW Chinese solar system, which is a new system. But the maximum power I got so far is 2.5KW...not bad. But this is not the ideal state, why?Let's take a look at this picture,The shadow on the panels you see is the tree with the rising sun behind the camera. The shadow of the tree occupies 50% of the solar panel area. It is this shadow that caused the power generation efficiency of my new system to not reach the power I wanted.
MULTIFIT: It is recommended to stay away from shadows, shading objects, etc., so that the power generation rate will be high.
Core power board, 25-year product quality and power compensation liability insurance.
The inverter provides five-year product quality and failure insurance.
The bracket is guaranteed for ten years.
No light pollution, zero emission, no radiation
Wire troughs for reasonable wiring.
Low cost, high yield
When installing power stations, it is best to erect lightning rods nearby to avoid unnecessary losses.
Professional and high-quality construction team, standardized construction process, to create high-quality power stations
According to the survey results, the best system design scheme and grid connection scheme are customized to escort the high-quality power station
Responsible for cooperating with the power supply company to complete the on-grid test, and realize self-generation and self-use and net access of surplus power
Responsible for preparing the application materials and handling the grid-connected access
Provides an intelligent monitoring system
Complete quality assurance system
Provide lifetime maintenance
According to your installation location, we can provide a certain difference in the service, you can contact customer for consultation.
Model No. | System Capacity | Solar Module | Inverter | Installation Area | Annual energy output(KWH) | ||
Power | Quantity | Capacity | Quantity | ||||
MU-SGS5KW | 5000W | 285W | 17 | 5KW | 1 | 34m2 | ≈8000 |
MU-SGS8KW | 8000W | 285W | 28 | 8KW | 1 | 56m2 | ≈12800 |
MU-SGS10KW | 10000W | 285W | 35 | 10KW | 1 | 70m2 | ≈16000 |
MU-SGS15KW | 15000W | 350W | 43 | 15KW | 1 | 86m2 | ≈24000 |
MU-SGS20KW | 20000W | 350W | 57 | 20KW | 1 | 114m2 | ≈32000 |
MU-SGS30KW | 30000W | 350W | 86 | 30KW | 1 | 172m2 | ≈48000 |
MU-SGS50KW | 50000W | 350W | 142 | 50KW | 1 | 284m2 | ≈80000 |
MU-SGS100KW | 100000W | 350W | 286 | 50KW | 2 | 572m2 | ≈160000 |
MU-SGS200KW | 200000W | 350W | 571 | 50KW | 4 | 1142m2 | ≈320000 |
Module No. | MU-SPS5KW | MU-SPS8KW | MU-SPS10KW | MU-SPS15KW | MU-SPS20KW | MU-SPS30KW | MU-SPS50KW | MU-SPS100KW | MU-SPS200KW | |
Distribution Box | Essential internal components of the distribution box AC switch, photovoltaic reclosing; Lightning surge protection, grounding copper bar | |||||||||
Bracket | 9*6m C type steel | 18*6m C type steel | 24*6m C type steel | 31*6m C type steel | 36*6m C type steel | Need to design | Need to design | Need to design | Need to design | |
Photovotaic cable | 20m | 30m | 35m | 70m | 80m | 120m | 200m | 450m | 800m | |
Accessories | MC4 connector C type steel connecting bolt and screw | MC4 connector Connecting bolt and screw Medium pressure block edge pressure block |
Remarks:
In the grid-connected system, the distribution box can be installed with lightning-proof conbiner box directly, and the space is regular.
(Lightning grounding will be calculated separately and specific design is required)
1.Photovoltaic group series: Photovoltaic modules are connected in series, series and parallel, and then connected to grid connected tp grid connected inverter
2.DC anti-reverse protection box: Disconnect the circuit overload and short circuit current generated to protect the photovoltaic module.
3.Grid-connected inverter: Key equipment for converting DC to AC
4.AC distribution box: connect the output cable of the grid-connected inverter to the connection point after over-voltage protection.
Factory system
Residential system
Ground system
Package & Shipping
Batteries have high requirements for transportation.
For questions about sea transportation, air transportation and road transportation, please consult us.
Multifit Office-Our Company
HQ located in Beijing, China and founded in 2009 Our factory located in 3/F,JieSi Bldg.,6 Keji West Road,Hi-Tech Zone,Shantou,Guangdong,China.