Installation area:86m²
Solar module:350W*43pcs
Inverter:15KW*1unit
AC Distribution box :15KW*1unit
Bracket : Need to design,41*41*2.5mm
PV Cables (MC4 to Inverter): Black & Red 100M each
MC4 CONNECTOR : 20set
What is your roof area?
What size system do you plan to build?
According to the provided roof area, the largest array of photovoltaic systems can be arranged
Provide the system installation guides after the system arrive
Professional and high-quality construction team, standardized construction process, to create high-quality power stations
Engineer site survey
Roof, load measurement
Shielding analysis, cable path planning
Responsible for cooperating with the power supply company to complete the on-grid test, and realize self-generation and self-use and net access of surplus power
According to the survey results, the best system design scheme and grid connection scheme are customized to escort the high-quality power station
Provides an intelligent monitoring system
Complete quality assurance system
Provide lifetime maintenance
Responsible for preparing the application materials and handling the grid-connected access
Provide a series of financial services, to provide customers with low interest loans
Because the fixed installation can not automatically track the sun's change of Angle like the tracking system, it needs to calculate the optimal inclination of the component arrangement according to the latitude to obtain the maximum solar radiation throughout the year and seek the maximum energy generation.
MULTIFIT: It is recommended to keep the best angle, so that the power generation rate will be high.
Core power panel, 25 years product quality and power compensation liability insurance.
Inverters provide five years of product quality and fault insurance.
The bracket is guaranteed for ten years.
Distributed photovoltaic systems can be installed anywhere there is sunlight.
Including rural areas, pastoral areas, mountainous areas, developing large, medium and small cities or buildings near the business district, the most widely used at present is the distributed photovoltaic grid project installed on the roof of buildings.Including schools, hospitals, shopping malls, villas, residents, factories, enterprises, car sheds, bus shelters and other roof which meet the load requirements of concrete, color steel plate and tile can be installed distributed PHOTOVOLTAIC power station.
Model No. | System Capacity | Solar Module | Inverter | Installation Area | Annual energy output(KWH) | ||
Power | Quantity | Capacity | Quantity | ||||
MU-SGS5KW | 5000W | 285W | 17 | 5KW | 1 | 34m2 | ≈8000 |
MU-SGS8KW | 8000W | 285W | 28 | 8KW | 1 | 56m2 | ≈12800 |
MU-SGS10KW | 10000W | 285W | 35 | 10KW | 1 | 70m2 | ≈16000 |
MU-SGS15KW | 15000W | 350W | 43 | 15KW | 1 | 86m2 | ≈24000 |
MU-SGS20KW | 20000W | 350W | 57 | 20KW | 1 | 114m2 | ≈32000 |
MU-SGS30KW | 30000W | 350W | 86 | 30KW | 1 | 172m2 | ≈48000 |
MU-SGS50KW | 50000W | 350W | 142 | 50KW | 1 | 284m2 | ≈80000 |
MU-SGS100KW | 100000W | 350W | 286 | 50KW | 2 | 572m2 | ≈160000 |
MU-SGS200KW | 200000W | 350W | 571 | 50KW | 4 | 1142m2 | ≈320000 |
Module No. | MU-SPS5KW | MU-SPS8KW | MU-SPS10KW | MU-SPS15KW | MU-SPS20KW | MU-SPS30KW | MU-SPS50KW | MU-SPS100KW | MU-SPS200KW | |
Distribution Box | Essential internal components of the distribution box AC switch, photovoltaic reclosing; Lightning surge protection, grounding copper bar | |||||||||
Bracket | 9*6m C type steel | 18*6m C type steel | 24*6m C type steel | 31*6m C type steel | 36*6m C type steel | Need to design | Need to design | Need to design | Need to design | |
Photovotaic cable | 20m | 30m | 35m | 70m | 80m | 120m | 200m | 450m | 800m | |
Accessories | MC4 connector C type steel connecting bolt and screw | MC4 connector Connecting bolt and screw Medium pressure block edge pressure block |
Remarks:
The specifications are only used for the system comparison of different specifications. Multifit can also design different specifications according to the personalized needs of customers.
Factory system
Residential system
Ground system
Package & Shipping
Batteries have high requirements for transportation.
For questions about sea transportation, air transportation and road transportation, please consult us.
Multifit Office-Our Company
HQ located in Beijing, China and founded in 2009 Our factory located in 3/F,JieSi Bldg.,6 Keji West Road,Hi-Tech Zone,Shantou,Guangdong,China.